Shanghai Subway Line 13 Extension Project

Φ 8.7m STEC ACPP Depth: 31.5m

Project Year: 2023

Project Overview

Project Summary

  • Escape shaft for the Shanghai subway line 13

Jello-Mud Results

  • Demonstrated Jello-Mud’s better lubrication, water-proofing, and annular-ring forming capability in vertical shaft projects.

Controlled cumulative inclination to <1mm (left)

Controlled cumulative inclination degree within <1 (Right)