Shenzhen Shenjiang Railroad SJSG-3 Tunnel Project
Φ 11.85m CRCHI EPB TBM
Project Year: 2024
Entrance Seal Design
Project Summary
Project Overview:
Shenjiang Railway SJSG-3 segment: 12.451 km, including shield tunneling and mining construction.
"Leading Pilot" shield machine's first section: 4566.4 meters.
Launch Seal Design:
Composed of rubber curtains and foldable pressure plates for effective sealing.
Critical for smooth tunnel initiation, especially in complex, water-rich strata.
Consequences of Seal Failure:
Risk of water and sand inflows.
Potential outcomes: surface collapse, traffic disruption, building damage, shield machine burial, and personal safety hazards.
Major social and economic impacts, leading to severe financial losses.
Jello-Mud Result
Stable pressure is established at the tunnel entrance.
During the sequential opening and closing of the reserved holes in the portal, Jello-Mud is fully extruded without any gas or liquid leakage.
When the ball valve at the observation port of the backfill grouting hole is opened, Jello-Mud is extruded without any gas or liquid leakage.
Jello-Mud exhibited void-filling, sealing, and water proofing capabilities
Contractor was able to save on costs compared to using high-cost tail-seal grease to seal the entrance ring
For more information on how Jello-Mud assisted in lubrication and settlement control in this project, please contact us for more details.
Illustration of Jello-Mud sealing the TBM entrance ring
Site photo indicating no Jello-Mud was stuck on the shield body, a good indicator of its lubrication capability.